Harbor Lights West building at 4421 Greenwood Ave N
HOA Board Reference

Property Intelligence & Operations Dashboard

Everything the board needs in one place — records, reserves, the elevator modernization, active initiatives, governance, and house rules.

Harbor Lights West

Harbor Lights West Condominium

Board Dashboard & Records Manual

Addresses4421 & 4425 Greenwood Ave N, Seattle, WA 98103
Built1988 · 2 buildings · 4 stories · 29 residential units
AssociationHarbor Lights West Condominium Association · UBI 601 794 750
PreparedJuly 21, 2026
Data confidence: Verified — public record / HOA doc Reported — confirm Lookup required

1 · Executive Overview

Year Built
1988
KC Assessor
Buildings
2
4421 & 4425
Residential Units
29
+1 parking unit
Stories
4
KC Assessor
Elevators
2
Hydraulic
Reserve Cash
$528K
2026 study projection
Zoning
LR1 (M)
see note
Site Area
13,000 sf
0.30 ac · Assessor

⚠️ Zoning correction

The King County Assessor records present zoning as LR1 (M) — Lowrise 1 with a Mandatory Housing Affordability suffix — not NC2P-55. NC zoning begins along the nearby commercial arterials; this parcel sits in the lowrise multifamily band. Confirm current mapping via the SDCI Permit & Site History tool, especially with Seattle's 2024–2026 Comprehensive Plan rezones in progress.

Parcel structure

As a condominium, Harbor Lights West has no single complex parcel — each unit carries its own King County parcel number in the 311062-XXXX series. Parcel 3110620060 is Unit 202 at 4421 Greenwood Ave N (700 sf, 1 bd / 1 ba, 3.34% allocated interest, 2025 assessed value $417,000). The complex-level record ("Harbor Lights West Condominium," Plat Block A) is reached from any unit page in the Assessor's eReal Property portal.

Market snapshot (2023–2025)

MetricValueSource
Typical sales velocity≈ 1 unit / yearMLS aggregator
Recent sale range$400,000 – $575,000MLS aggregator
Unit mix (observed)1 bd/1 ba (589–705 sf) · 2 bd/1 ba (~800 sf)MLS aggregator
Latest recorded sale (Unit 202)$410,000 · 6/28/2025 · Warranty DeedKC Assessor
Monthly assessmentsRaised 5% for 2025 Ratified budget2025 Ratified Budget

2 · Reserves & Finances

Sources: 2026 AssocReserves Reserve Study (#7026-9, Apr 2026) · 2025 Ratified Budget · Balance Sheet 7/2/2025 · 2024 Budget vs. Actuals · 2024 Tax Return (Form 1120-H)

📊

Refresh these figures from Buildium CSVs

drag & drop, or click to browse  ·  no data loaded yet Choose CSVs
🕓 Figures as of — loading source list… Filed figures How these update →
Reserve Cash
—
—
Operating Cash
—
—
Percent Funded
—
2026 study · Weak
Fully Funded Balance
—
—
YTD Income
—
—
YTD Expenses
—
—
Delinquencies
—
not loaded
Monthly Assessments
—
—

Loading the board figures…

⚠️ Funding gap & a figure to reconcile

Reserves are — funded — the association holds about a third of the savings it should have for future repairs. That is the weak range, with a medium chance of needing a special assessment.

The 2026 reserve study (#7026-9, April 16, 2026) says we should be setting aside $13,530/mo to fully catch up, or $10,740/mo under its lower “70% threshold” plan. We currently budget $5,920/mo — roughly half the lower figure. Closing that gap is the main decision for the 2027 budget.

The study also proposes a — special assessment in 2027 for elevator modernization, the elevator cab remodel, and exterior painting. Fully funded, reserves would hold —. Today they are short by about — per unit.

Major reserve components (2026 study, #7026-9)

Component ⇅ Current cost ⇅ Remaining life ⇅ Note
—

Vendor invoices on file

VendorServicePeriod coveredMonthly avgNotes
—

Annual component deterioration ≈ $123,403/yr (2026 study). "Remaining life 0" means the component is at or past its modeled replacement point — not that it has failed. 31 total funded components; largest driver is elevator hydraulics (15.45% of total deterioration).

Balance sheet & 2024 performance

—
—
—
—
—
—
—
—
—
—
—
—

2A · Management & Operations

3Stripe's task queue, vendor payables and cash movement, read straight from the Buildium exports. Drop the CSVs on the upload box in section 2 and this fills in.

No operations reports loaded yet

Drop open_tasks.csv, completed_tasks.csv, unpaid_bills_by_vendor.csv and cash_flow_statement.csv onto the upload box in section 2. Buildium's Work orders report is not used here — 3Stripe tracks everything through Tasks, and that report comes back empty.

4 · Capital Projects & Initiatives

Status of active and exploratory building initiatives

Elevator ModernizationOn hold
Two 1988 hydraulic elevators. No intent to proceed — the board is not pursuing modernization at this time, and the TK Elevator price hold (Sep 3, 2026) has been allowed to lapse. The 2026 reserve study still carries — for the overhaul and — for the cab remodel, and proposes a — special assessment in 2027 covering elevators and exterior painting — so this remains a reserve-planning line even while dormant. Full bid comparison and scope retained below.
EV ChargingStudy only
Feasible but requires a major electrical upgrade — the existing 200A 3-phase panel is full. Plan is 15 Level-1 chargers (~27 kW) on a new 400A service. ROM ~$30,000. Hultz|BHU Engineers, Apr 2023. No decision recorded.
AC / Mini-SplitsGroup pricing
Owner interest in individual mini-split AC; board consolidating quotes for group pricing. 2024 HVAC feasibility pegged whole-system approaches near ~$30K/unit. Any install pierces Hardie siding → requires board architectural approval.
Garage LightingBoard priority
Agreed top near-term item; a contact can supply an upgrade for ~$3,000. Improves safety and security in the podium garage.
Deck RepaintingIn budget
Exterior deck/surface repaint is already in the operating budget; management to refresh vendor quotes. Ties to the reserve study's $125K exterior-surfaces line.
Fire / Knox BoxFollow-up
President to follow up with Seattle Fire Dept on Knox Box installation and a key-safe plan for emergency access.
LandscapingRefresh pricing
Vertumni, LLC proposal on file: $325/mo (Nov–Feb) / $425/mo (Mar–Oct). Dated 2021 — pricing is likely stale; re-bid or re-confirm the current contract.
Elevator modernization — archived detail (bids, scope, reserve basis)

Retained for the record. The board has no current intent to proceed; figures below are from the Sept 2025 president's memo and the 2026 reserve study and are not live quotes.

Elevators
2
Hydraulic, 5 stops
Recommended Bid
—
—
Reserve Balance
—
2026 study (Jan 2027)
Buffer After (TK)
—
—
Install Deadline
Sep 3 2026
⚠️ 29 days · TKE price hold

Bid comparison

VendorBase modernizationCode work (SMRC)Total projectReserves after
—

✅ Recommendation (President's memo, Sept 2025)

TK Elevator is the better financial choice: it can be paid for entirely from reserves and leaves a bigger cushion than Washington Elevator. The 2026 reserve study budgets — for the elevator overhaul and — for the cab remodel — — together. TK bid —, well under that.

The study also proposes a — special assessment in 2027 covering the elevators and exterior painting. Confirm that with the reserve specialist and bring it to a board vote. TK holds this price until September 3, 2026.

Basis of figures: TK Elevator's Aug 26, 2025 budget proposal is — for elevator work only, plus an estimated — building-related ROM; the "—" line reflects the board's planning estimate. Code-related work by others (fire alarm panel, HVAC in machine room, electrical, patching) is — per the SMR Construction (Washington Elevator team) proposal dated 8/1/2025, applied equally to both scenarios. Both are budget-level; final price is subject to on-site survey.

Modernization scope checklist (per elevator → both)

ComponentPer elevatorBoth
Controller replacement (microprocessor)$25K–$35K$50K–$70K
Power unit (pump, motor, valves)$15K–$20K$30K–$40K
Hydraulic jack inspection / replacement$10K–$20K$20K–$40K
Fixtures (car + hall, ADA)$5K–$10K$10K–$20K
Door equipment (operators, interlocks)$7.5K–$12K$15K–$24K
Cab interior (optional cosmetic)$7K–$15K$14K–$30K
Door lock monitoring (DLM)$3K–$5K$6K–$10K
Permits, engineering & fire-service upgrades$5K–$10K$10K–$20K

5 · Governance & Meetings

Board, management, cadence, and recent decisions — updated through June 2026 board meeting

Board of Directors

Loading the current board…

Board Meetings
3rd Tue
monthly, evening
Annual Meeting
Jul 9, 2025
AGM held — minutes filed
Quorum
51%
of interests
Governing Law
RCW 64.34
+ 64.90 overlay

Recent decisions — June 2026 board meeting

  • Tree trimming$2,700 approved — all west-side trees + 5-ft reduction; JB to communicate approval.
  • Elevator (TK contract)Cancellation notice sent to TK; transitioning to Washington Elevator. JM to coordinate termination date with JB.
  • Deck resurfacingAdditional meeting to occur once water-intrusion bids return; board to decide by email.
  • Water intrusionAwaiting contractor bids; will escalate to meeting if needed.
  • Lock boxJM + JM to meet and attempt entry; battery replacement may be needed.
  • EV chargingJM to ask JB to survey owners re: selling a parking spot; Brady researching city public-charging incentive program.
  • Google Workspace / emailJosh setting up harborlightswest.com domain tools; Jennifer to forward old board inbox credentials.
  • Community potluckMoved to 15th (Wednesday); board brings beverages; Jennifer to post notice; JM to send owner email.
  • Power washingJM to ask vendors (landscapers/cleaners) about garage area; MT confirmed common spaces washed regularly.
  • SmokingCommon space between buildings is not 25 ft from decks/entries; JB to send violation letter.
  • Grills / BBQs50 ft rule questioned; JM to request exact governing-document language from JB.
  • 2025 minutes approvedMinutes from May approved. JM to share earlier 2026 Gemini minutes with board.

Cadence: 3rd Tuesday monthly evening (confirmed by recurring meeting titles). AGM confirmed July 9, 2025. June 2026 minutes filed. Earlier 2026 Gemini notes exist in Meeting Minutes folder.

6 · House Rules — Quick Reference

Condensed from the Harbor Lights West House Rules (approved 05/09/2022). The full document governs; this is a summary.

  • Quiet hoursNo audible noise 10 PM–8 AM (Sun–Thu) and 11 PM–9 AM (Fri–Sat), including decks.
  • PetsAllowed if not disturbing others; leash/carry in common areas; owners clean up waste. Exotics need board approval.
  • Parking / garageOperative vehicles only; improper parking is subject to towing; no idling (triggers the fire alarm).
  • BicyclesMust be registered; $5/month storage (billed annually); unregistered bikes removed.
  • LeasingWhole-unit only, written lease; owner screens tenant & reports info within 24 hrs; 14-day move-out notice. No short-term rentals.
  • SmokingProhibited in hallways, stairwells, elevators, foyers, and the garage.
  • BBQ / open flameGrills and open flame are prohibited everywhere — no exceptions.
  • Garbage / recyclingBagged refuse only; flatten cardboard; yard/kitchen waste in the green bin; owners haul oversized items.
  • Common areasNo storage in hallways/stairwells; no exterior fixtures without written board approval.
  • ModificationsArchitectural changes (AC units, exterior attachments, canopies) require written board approval.
  • Move in / out$100 move-in + $100 move-out fee; reserve the elevator stop key; post notice 24–48 hrs ahead.
  • Violations7-day cure notice, then $50 fine plus $10/day; dues late fee after the 10th.

Filename suggests an update code ("260824"), but the in-document approval date is 05/09/2022 — confirm whether a newer revision supersedes it.

7 · Architecture & Structure

SystemWhat the record showsStatus
SuperstructureWood frame, 4 stories, average/good quality, condition "Good" (Assessor). The building is often described as wood frame sitting on a post-tensioned concrete parking deck. That means concrete with steel cables tensioned inside it. It matters for one practical reason: nobody should cut, core or drill into that deck without an engineer. That is plausible for a 1988 building with basement parking, but the public record does not confirm it — check the original structural drawings (§10).Partly verified
Foundation / parkingBasement-level parking (a separate "parking unit" exists in the condo structure). Foundation type requires original drawings.Lookup
EnvelopeRehabilitated 2010–2011: siding, windows, patio doors, deck railings under SDCI permit 6258428-CN ($679,600, completed 8/23/2011). Assembly spec is in the approved plans.SDCI
RoofingNo standalone roofing permit in the post-2005 dataset. Reserve study models a 50 mil PVC roof at end of life — verify last replacement date & membrane.Lookup
Vertical transportTwo hydraulic elevators (existence confirmed by Assessor); at modernization age — see §3. Annual SDCI conveyance operating permit required; ID searchable in the Services Portal.Verified
Plumbing1988 construction typically used copper supply and ABS/cast-iron waste. Water from a water district; public sewer (Assessor land data).Era-typical
HVACLate-1980s Seattle lowrise condos are predominantly electric resistance heat, individually metered, no central plant.Era-typical
Fire & life safetySecurity system on record. Sprinkler coverage not in public data; 1988 pre-dates broad residential mandates. Note the 2024 sprinkler-repair spend — verify fire-alarm confidence testing (SFD) and garage coverage.Lookup

🔧 Age-based watchlist (1988 building)

Envelope — redone 2010–11, now ~15 yrs (inspect sealants/flashings). Elevators — modernization now (§3). Roofing & deck membranes — at/near end of life per reserve study. Domestic water piping — approaching a 40–50 yr horizon. Garage concrete — periodic structural assessment recommended.

8 · SDCI Permit & Construction History

Permits in Seattle's online dataset (2005–present)

Permit #TypeScopeIssuedCompletedValue
6258428-CNAddition/Alteration — MultifamilyRepair/replace siding, windows, patio doors, exterior deck railings — 4421 Greenwood Ave N09/07/201008/23/2011$679,600

This is the only building permit for 4421/4425 Greenwood Ave N in the city's open-data permit set. Trade permits (electrical, mechanical) and elevator conveyance permits live in separate registers; search both addresses in the Seattle Services Portal for the full picture.

The 1988 original construction record

The original Master Use Permit and building permit pre-date Seattle's online systems (reliable coverage begins ~2005). The 1988 permit set — including approved architectural and structural drawings — exists on microfiche in the SDCI Microfilm Library (see §10 for ordering).

Where to search, live

ToolUse it forLink
SDCI Permit & Site HistoryZoning, all permits, documents, Assessor linksmaps.seattle.gov/sdcipermithistory
Seattle Services PortalPermit detail, inspections, elevator/conveyance certificatesservices.seattle.gov/portal
Seattle Open Data — Building PermitsBulk/API queries of the permit datasetdata.seattle.gov

10 · Blueprint & Microfilm Archive Guide

A · Original 1988 drawings
Email SCI_Microfilm@seattle.gov — the library holds microfiche permits 1970–2004. Give both addresses, "Harbor Lights West Condominium," built 1988, and request the building permit file with approved architectural & structural plans. Requests must be individually written; ask for the Certificate of Occupancy and site/drainage plans too.
B · 2010–11 envelope plans
Plans from 2007–present are emailable — cite permit 6258428-CN. These document the current siding assembly, window schedule, and deck-rail details: the definitive envelope spec for maintenance bids. Some documents download directly from the Services Portal.
C · Condo map & declaration
King County Recorder: recordsearch.kingcounty.gov — "HARBOR LIGHTS WEST," 1987–1989. The recorded Survey Map & Plans are effectively as-built floor/boundary drawings — often the fastest blueprint substitute. Certified copies from the Recorder's Office, 500 4th Ave Rm 311.
D · Research stack

✅ Suggested board action items

1) Elevator vote — deadline Sep 3, 2026 (TKE price hold expires): bring bids to a board vote immediately (§3). 2) 2027 budget: adopt a reserve contribution of $13,530/mo (Full) or $10,740/mo (70% Threshold) — current $5,920/mo is inadequate. 3) Special assessment: present the 2026 study's — preliminary assessment to owners for elevator modernization + exterior painting. 4) Order the 1988 microfiche plan set — resolves structural "lookup" flags. 5) Pull the Declaration recording number and store it with all amendments. 6) Re-bid or re-confirm the landscaping contract.

11 · Sources & Data Provenance

Compiled July 21, 2026, from Harbor Lights West project records and public data. Figures carry a confidence badge; re-verify before relying on this document for legal, insurance, or transactional purposes.

SourceUsed for
2026 AssocReserves Reserve Study (#7026-9, Apr 16, 2026) — Update No-Site-VisitPercent funded (—), fully funded balance (—), component costs, special-assessment recommendation (—), 30-year funding plan
2025 Ratified Budget · Balance Sheet 7/2/2025 · 2024 Budget vs. ActualsAssessments, operating expense, reserve cash, dues increase, performance
Elevator Reserve Impact Memo (Sept 2025) + TK Elevator & SMR Construction proposalsBid comparison, recommendation, scope, deadlines
2025 General/Board Meeting Minutes · 2024 Annual Minutes · 2025 AGM AgendaBoard roster, management, quorum, decisions, cadence
House Rules (approved 05/09/2022) · EV Charging Feasibility (Hultz|BHU, 2023) · Vertumni landscaping proposalRules quick reference, initiatives
KC Assessor — parcel 3110620060 · Seattle Open Data (SDCI)Year built, units, structure, elevator, zoning, permit 6258428-CN

12 · Reports & Data Uploads

Where the numbers on this dashboard come from, and how to change them.

Uploading publishes straight away.

Dropping the CSVs on the upload box in §2 Reserves & Finances updates the figures for every director immediately — there is no separate publish step. The banner records who published them and when, and shows a short what changed summary against the previous upload.

If something looks wrong afterwards, Undo last publish restores the previous set in one click.

Who can publish

Any Admin, or whoever holds the President or Treasurer title in Settings. Everyone else doesn't see the upload box at all — they see a note pointing them at the people who can. Every published set records who published it and when, so a number on screen can always be traced back to a person. If a figure looks wrong, email admin@harborlightswest.com.

If the banner turns amber

It reads Stale once the figures pass 45 days old — a prompt to publish a fresh set, not an error. It exists so an overlooked refresh is visible rather than quietly misleading the board.

The ten reports

Report What it updates here Identified by column
Balance Sheet ↗ Reserve Cash · Operating Cash §2 AccountClass + GlAccountName + Amount
Budget vs. Actuals ↗ YTD Income · YTD Expenses · percent of annual budget consumed §2 Account Type + Period Actual + Annual Budget
Delinquency / Aging ↗ Delinquent unit count and total owed §2 Balance0to30Days or isEvictionPending
Cash Flow ↗ Inflow/outflow by month, net cash movement §2A isCashPosting + entryDate
Unpaid Bills by Vendor ↗ Payables aging, vendor totals §2A VendorName + AmountCurrent
Open Tasks ↗ Open action-item count §2A TaskStatus + TaskCategoryName
Completed Tasks ↗ Closed action-item count §2A TaskStatus + ClosedDateRaw
Trial Balance ↗ Total assets, and a check that the ledger ties to $0.00 §2 isCashPosting + entryDate + PostingId
Recurring Charges ↗ Roster size, monthly assessment total, roster balance owed §2 RecurringCharges + DelinquencyStatusId
Property Statement ↗ Beginning cash, current liabilities, unpaid bills, pending ePay §2 buildingReserve + currentLiabilities

Every other Buildium report

The ten above are the ones this dashboard parses. These are the rest of what the portal exposes, linked for convenience — they open in a new tab and, like everything in this section, require a board member Buildium login.

Files are recognised by their column headers, not their names — so exports work exactly as downloaded. If a CSV matches none of the ten, you get a notice rather than silence.

PDFs

Reserve studies, invoices and insurance certificates can go on the same box. They do not change any number above — they are only listed as received, so a PDF can never quietly move a figure. Like CSVs, the list is private to your browser.

1 / 12